What this subject covers

Turning crop residues, dung and oils into fuel: briquettes, gasifiers, biogas plants and liquid biofuels, and auditing farm energy.

In the exams: ICAR AIEEA-PG Unit V; ICAR AICE subject 42 Units 1–3 and 8; ICAR AICE subject 39 Unit 9; GATE AG biogas sizing (2 of 8 papers)

Where the 32 questions fall

How our questions for Nepal Engineering Council Registration Exam spread across the units of Bio-energy Systems: Design & Applications. Difficulty: 8 easy, 19 medium, 5 hard.

Biogas plant sizing and gas yield7
Anaerobic digestion stages5
Biogas plant types: floating drum and fixed dome5
Briquetting and pelleting2
Gasification: updraft and downdraft gasifiers2
Producer gas and dual-fuel engines2
Biodiesel and transesterification2
Energy audit and energy ratio in agriculture2
Combustion of biomass1
Pyrolysis1
Bio-ethanol1
Biomass characterisation: proximate and ultimate analysis1
Calorific value1

6 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

1 · Anaerobic digestion stages · easy

The correct order of the four stages of anaerobic digestion is:

  1. Acidogenesis, hydrolysis, methanogenesis, acetogenesis
  2. Methanogenesis, acetogenesis, acidogenesis, hydrolysis
  3. Hydrolysis, acidogenesis, acetogenesis, methanogenesis
  4. Hydrolysis, methanogenesis, acidogenesis, acetogenesis
Answer and working

C. Hydrolysis, acidogenesis, acetogenesis, methanogenesis

Complex polymers (carbohydrates, proteins, fats) are first hydrolysed to sugars, amino acids and fatty acids; acidogenic bacteria ferment these to volatile fatty acids, alcohols, H2 and CO2; acetogens convert the longer acids to acetate, H2 and CO2; methanogenic archaea finally produce methane from acetate or from H2 and CO2.

2 · Anaerobic digestion stages · easy

The optimum pH range for methanogenic digestion is about:

  1. 4.0–5.0
  2. 8.5–9.5
  3. 2.0–3.0
  4. 6.8–7.2
Answer and working

D. 6.8–7.2

Methanogens are the most pH-sensitive group; methane production is best near neutral pH, roughly 6.8–7.2, and falls sharply below about 6.5. A falling pH signals accumulating volatile fatty acids (souring), usually from overloading. pH 4–5 suits yeast fermentation to ethanol, not methanogenesis. pH 8.5–9.5 raises free-ammonia toxicity, and pH 2–3 stops methanogens entirely.

3 · Biogas plant types: floating drum and fixed dome · medium

Biogas that is to be compressed and used as a vehicle fuel must first be upgraded, which mainly means:

  1. Adding air to raise its oxygen content
  2. Removing CO2 and impurities
  3. Heating it to crack most of the methane into hydrogen (H2), which has a higher energy per cubic metre
  4. Adding nitrogen to lower its flame speed
Answer and working

B. Removing CO2 and impurities

Raw biogas is about 50–70% CH4 with 30–50% CO2, traces of H2S and saturation water. Upgrading by water scrubbing, pressure-swing adsorption, membranes or chemical absorption removes CO2 and impurities to give biomethane with over about 90–97% methane, depending on the specification. H2S must also be removed because it is toxic and corrosive.

4 · Biogas plant sizing and gas yield · hard

A family of 5 needs 0.34 m³ of biogas per person per day for cooking. The gas yield is 0.04 m³ per kg of fresh dung, dung is mixed 1:1 with water (slurry 1000 kg/m³), and the HRT is 50 days. The required digester volume is about:

  1. 2.13 m³
  2. 85.0 m³
  3. 4.25 m³
  4. 0.085 m³
Answer and working

C. 4.25 m³

Gas demand = 5 × 0.34 = 1.70 m³/day. Dung = 1.70 ÷ 0.04 = 42.5 kg/day; slurry = 85 kg/day = 0.085 m³/day. Volume = 0.085 × 50 = 4.25 m³. Multiplying gas demand by HRT (85.0 m³) confuses gas volume with slurry volume. 2.13 m³ forgets the dilution water (42.5 kg dung only, 0.0425 × 50).

5 · Biogas plant sizing and gas yield · medium

For a family biogas plant, the hydraulic retention time chosen at the design stage should be:

  1. Longer in cold climates and seasons, because gas production per day falls as temperature drops
  2. The same everywhere, because it depends only on the feed
  3. Shorter in cold climates to keep the slurry warm
  4. Less than 5 days, to prevent washout of methanogens
Answer and working

A. Longer in cold climates and seasons, because gas production per day falls as temperature drops

Microbial activity slows sharply with temperature, so unheated plants in cooler regions need longer HRT (bigger digesters) for the same degradation. National programmes therefore specify longer HRTs for hill and cold regions than for warm plains. Very short HRTs risk washout of slow-growing methanogens, which is the opposite problem.

6 · Calorific value · medium

A rice mill processes 1000 t of paddy per season. Husk is 20% of paddy mass and has a heating value of 13 MJ/kg. The energy available in the husk is:

  1. 13000 GJ
  2. 2.6 GJ
  3. 2600 GJ
  4. 2600000 GJ
Answer and working

C. 2600 GJ

Husk = 1000 × 0.20 = 200 t = 200,000 kg. Energy = 200,000 × 13 MJ = 2,600,000 MJ = 2600 GJ. Using the whole paddy mass gives 13,000 GJ; the other options are unit slips (1 GJ = 1000 MJ). The husk share of paddy commonly lies near 20% but varies by variety and milling.

Ten here, 32 in the app. The Laisha app has every practice question we have written to Nepal Engineering Council Registration Exam in this subject, marked as you go, with timed papers, a jump-to-unanswered list and a certificate when you pass at 70 per cent.

Free for ten days, then one subscription of US$10 a month. We would rather say so here than have you find it later.

Practise the full set in Laisha →

Read the subject

Bio-energy Systems: Design & ApplicationsThe full study manual, free Nepal Engineering Council Registration ExamFormat, sections and how it has changed

More Nepal Engineering Council Registration Exam practice

Crop Production & Protection for EngineersBuilding Materials, Theory of Structures & ConstructionSoil MechanicsEngineering Economics, Project & Business ManagementSprinkler & Micro-Irrigation SystemsProtected Cultivation & Greenhouse EngineeringFarm Machinery & Equipment I — Tillage, Sowing, Planting, FertiliserEngineering Mechanics (Statics & Dynamics)

Bio-energy Systems: Design & Applications for other exams

ICAR AICE-JRF/SRF · IndiaICAR AIEEA-PG · IndiaASRB NET · IndiaAgricultural and Biosystems Engineers Licensure Examination · PhilippinesGATE · India

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.