What this subject covers

Planning a farmstead and designing its buildings, stores and animal houses, including the ventilation that keeps animals healthy.

In the exams: NCEES PE Facilities & Structures 12–18 questions; PRC ABE structures, environment and bioprocess (36%); ICAR AIEEA-PG Unit VI (farmstead planning, heating and cooling load); TNPSC Unit V

What Agricultural and Biosystems Engineers Licensure Examination asks from it

PRC Agricultural and Biosystems Engineers Licensure Examination (Philippines)

Structures, environment and bioprocess (36% bundle): livestock and poultry housing design, space requirements, ventilation and evaporative cooling, storage structures, and PAES standards for agricultural buildings.

Where the 38 questions fall

How our questions for Agricultural and Biosystems Engineers Licensure Examination spread across the units of Agricultural Structures & Environmental Control. Difficulty: 5 easy, 17 medium, 16 hard.

Poultry housing5
Ventilation rate from heat and moisture balance5
Farmstead planning4
Manure storage structures4
Dairy cattle housing3
Swine housing3
Space requirements for livestock3
Farm roads and fencing3
Design loads: dead, live, wind, snow and grain2
Rat-proof godowns2
Post-frame buildings2
Rural houses and threshing floors1
Structural design of bins and silos1

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

1 · Farmstead planning · hard

A farm is planning a dairy unit beside an existing feed store. The milk tanker, feed deliveries, manure spreaders and dead-stock collection all use one track through the cow yards. What is the main planning fault?

  1. The track is too short, because milk tankers need at least a 1 km approach road
  2. Feed deliveries should pass through the cow yards so that cows can see the feed
  3. Clean and dirty traffic share one route, creating a biosecurity and hygiene risk
  4. Dead-stock collection should be inside the milking parlour for the driver's convenience
Answer and working

C. Clean and dirty traffic share one route, creating a biosecurity and hygiene risk

Good layout separates clean traffic (feed, milk) from dirty traffic (manure, dead stock) and keeps outside vehicles at the edge of the unit. Dead-stock collection belongs at the perimeter, never in the parlour, and there is no rule of a minimum approach length.

Further reading: MidWest Plan Service, Structures and Environment Handbook (MWPS-1)

2 · Dairy cattle housing · medium

In which milking parlour do cows stand at right angles to the pit and get milked from behind, between the hind legs?

  1. Herringbone parlour at an angle
  2. Tandem (side-opening) parlour
  3. Parallel (side-by-side) parlour
  4. Walk-through abreast milking shed
Answer and working

C. Parallel (side-by-side) parlour

In a parallel parlour cows stand at 90° to the pit and units are attached between the hind legs. In a herringbone cows stand at an angle and are milked from the side; in a tandem they stand nose to tail along the pit.

Further reading: MWPS-7 Dairy Freestall Housing and Equipment

3 · Dairy cattle housing · hard

A dairy farm in a hot, humid coastal region installed fine misters that spray into the air of the feed alley, but the cows still show heat stress. What change is most likely to help?

  1. Increase the mist output until the air in the whole barn becomes completely saturated
  2. Wet the cows' coats with sprinklers in cycles and evaporate the water with fans
  3. Close the side curtains so that the cool misted air cannot escape from the barn
  4. Remove the fans, since moving air dries the cows and so raises their heat load
Answer and working

B. Wet the cows' coats with sprinklers in cycles and evaporate the water with fans

Humid air can absorb little extra water, so misting the air cools it little and raises humidity. Wetting the coat and then evaporating that water with fans takes heat directly from the cow. Saturating the air or closing curtains worsens the problem, and air movement increases heat loss.

Further reading: MWPS-7 Dairy Freestall Housing and Equipment

4 · Dairy cattle housing · hard

Why is a high eave or roof height recommended for naturally ventilated dairy sheds in hot climates?

  1. It lets the shed hold more hay above the cows, which insulates them from the sun
  2. It reduces wind flow through the shed, which otherwise chills the cows in summer
  3. It boosts the stack effect and moves the hot roof away from the cows
  4. Taller roofs collect less dust, so the cows' respiratory health improves directly
Answer and working

C. It boosts the stack effect and moves the hot roof away from the cows

Height between inlet and outlet increases stack-driven airflow, and a roof further away delivers less radiant heat to the animals. Overhead hay storage blocks ventilation; wind through the shed is wanted in summer; dust is not the reason.

Further reading: MWPS-7; FAO Rural Structures in the Tropics

5 · Poultry housing · easy

Why are standby generators and alarms treated as essential parts of a closed, mechanically ventilated poultry house?

  1. Generators are needed to light the house at night under welfare law everywhere
  2. Alarms warn when egg production drops, which fans cannot otherwise detect
  3. Generators heat the house in summer when the evaporative pads fail
  4. A power cut stops the fans, and birds can die of heat within a short time
Answer and working

D. A power cut stops the fans, and birds can die of heat within a short time

A closed house holding thousands of birds overheats quickly when fans stop, so backup power and failure alarms protect the flock. The other reasons describe functions that are not why backup systems are mandatory parts of the design.

Further reading: MWPS-32

6 · Swine housing · medium

What is the main purpose of all-in, all-out management by room in a pig unit?

  1. To empty, clean and dry each room between batches and break disease cycles
  2. To keep pigs of all ages together so older pigs teach younger ones to eat
  3. To let pigs move freely between rooms so each finds its preferred temperature
  4. To allow continuous filling so that rooms are never empty or unprofitable
Answer and working

A. To empty, clean and dry each room between batches and break disease cycles

Moving whole batches in and out together lets each room be cleaned and rested, which breaks the transfer of pathogens from older to younger pigs. Mixing ages and continuous flow are exactly what all-in, all-out avoids.

Further reading: MWPS-8

7 · Space requirements for livestock · hard

A consultant designing a pig unit for export to several countries quotes a single 'international' space allowance per pig. What is wrong with this approach?

  1. Space allowances are law in some countries and advice in others, and they differ
  2. Space per pig is a universal biological constant set by the pig's body length
  3. Space allowances apply only to cattle; pigs have no space requirements
  4. International standards fix one space value per pig regardless of live weight
Answer and working

A. Space allowances are law in some countries and advice in others, and they differ

Minimum space is legal in the EU and some other jurisdictions and advisory elsewhere, with different values and weight bands. It rises with live weight in every system. There is no single international figure.

Further reading: Council Directive 2008/120/EC; MWPS-8

8 · Ventilation rate from heat and moisture balance · hard

Animals and wet surfaces in a winter barn release 40 kg/h of water vapour. Inside air is to be held at humidity ratio 0.006 kg/kg; outside air is 0.003 kg/kg. Taking ρ = 1.2 kg/m³, what ventilation rate is needed?

  1. 13,333 m³/h
  2. 11,111 m³/h
  3. 5,556 m³/h
  4. 3,704 m³/h
Answer and working

B. 11,111 m³/h

Dry-air flow = 40/(0.0060 − 0.0030) = 13,333 kg/h; volume = 13,333/1.2 = 11,111 m³/h. 13,333 leaves the flow in kg/h; 5,556 uses the inside humidity ratio alone; 3,704 adds the humidity ratios instead of subtracting.

Further reading: Albright, Environment Control for Animals and Plants

9 · Structural design of bins and silos · hard

A bunker silo feeds 60 cows 25 kg of silage each per day. Silage density is 650 kg/m³ and the face must be removed at least 15 cm per day to limit spoilage. What is the largest face area that achieves this?

  1. 0.35 m²
  2. 23.1 m²
  3. 10.0 m²
  4. 15.4 m²
Answer and working

D. 15.4 m²

Daily volume = 60 × 25/650 = 2.31 m³; face = 2.31/0.15 = 15.4 m². 0.35 m² multiplies; 23.1 m² uses 10 cm; 10.0 m² skips the density conversion. Recommended removal rates vary (roughly 15–30 cm/day), so the stem fixes it.

Further reading: Silage management texts

10 · Manure storage structures · medium

What mainly decides the minimum storage period for a slurry store in many countries?

  1. The size of the slurry tanker, since the store must fill exactly one tanker per day
  2. Legal closed periods for spreading, plus the crop and soil spreading calendar
  3. The daily milk yield of the herd, which sets the volume of parlour washwater
  4. The colour of the slurry, which shows when it has matured and is ready to spread
Answer and working

B. Legal closed periods for spreading, plus the crop and soil spreading calendar

Storage lets manure be spread when crops can use it and soils can accept it; nitrate and water-protection rules in many countries forbid spreading in winter or the rainy season, fixing the minimum months of storage. Tanker size, milk yield and colour do not set the period.

Further reading: EU Nitrates Directive guidance; NRCS AWMFH

Ten here, 38 in the app. The Laisha app has every practice question we have written to Agricultural and Biosystems Engineers Licensure Examination in this subject, marked as you go, with timed papers, a jump-to-unanswered list and a certificate when you pass at 70 per cent.

Free for ten days, then one subscription of US$10 a month. We would rather say so here than have you find it later.

Practise the full set in Laisha →

Read the subject

Agricultural Structures & Environmental ControlThe full study manual, free Agricultural and Biosystems Engineers Licensure ExaminationFormat, sections and how it has changed

More Agricultural and Biosystems Engineers Licensure Examination practice

Engineering Drawing, Graphics & CADCrop Production & Protection for EngineersAquacultural & Forest Engineering (regional)Workshop Technology & ManufacturingAgricultural Waste Management & Environmental EngineeringBuilding Materials, Theory of Structures & ConstructionEngineering Economics, Project & Business ManagementProfessional Practice, Ethics & LawsBio-energy Systems: Design & ApplicationsSoil Science for EngineersRenewable Energy Sources (Solar, Wind)Sprinkler & Micro-Irrigation SystemsFarm Power SourcesMachine DesignElectrical Machines & Power UtilisationFarm Machinery & Equipment I — Tillage, Sowing, Planting, FertiliserStrength of MaterialsFarm Machinery Management & EconomicsTheory of MachinesEngineering Thermodynamics

Agricultural Structures & Environmental Control for other exams

NCEES PE Agricultural and Biological Engineering · USAICAR AIEEA-PG · India

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.