Agricultural and Biosystems Engineers Licensure Examination (ABELE) · Philippines · Professional Regulatory Board of Agricultural and Biosystems Engineering, PRC
Original practice questions written to the published syllabus · not past papersSolar thermal, solar PV, wind and micro-hydro for farms, from sun geometry to sizing a solar pump.
In the exams: GATE AG Section 3 (solar PV in 5 of 8, wind in 5 of 8 papers 2019–26); ICAR AIEEA-PG Unit V; ICAR AICE subject 42 Units 4, 5 and 7; NCEES PE energy sources
How our questions for Agricultural and Biosystems Engineers Licensure Examination spread across the units of Renewable Energy Sources (Solar, Wind). Difficulty: 14 easy, 24 medium, 10 hard.
| Solar dryers, cookers, water heaters and stills | 7 | |
| PV system sizing: on-grid and off-grid | 6 | |
| Solar pumps and agri-voltaics | 5 | |
| Micro-hydro | 5 | |
| Wind turbines and water-pumping windmills | 4 | |
| Energy scenario | 3 | |
| Solar radiation geometry | 3 | |
| Power in the wind and the Betz limit | 3 | |
| Energy storage | 3 | |
| Measurement of solar radiation | 2 | |
| Flat-plate collectors and their efficiency | 2 | |
| Photovoltaic cell physics and the I-V curve | 2 | |
| Fill factor and MPPT | 2 | |
| Concentrating collectors | 1 |
Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.
Which of the following is a renewable (flow) energy source rather than a stock?
C. Wind
Wind is continually replenished by solar heating of the atmosphere. Coal, natural gas and uranium are stocks laid down over geological time and used far faster than they form.
In a net-metering arrangement for a farm PV system, the farmer is billed for:
C. Net consumption: energy imported minus energy exported over the billing period
Under net metering the meter effectively runs backwards on export, so the bill is for net import. Selling all generation at a fixed price and buying all consumption separately is gross metering (a feed-in tariff). Exact rules and settlement prices are set by each national regulator.
A solar pump costing 300,000 currency units replaces diesel pumping and saves 60,000 per year in fuel and maintenance. What is the simple payback period, and what is its main weakness as a decision measure?
A. 5 years; it ignores the time value of money and savings after payback
Simple payback = 300,000 / 60,000 = 5 years. It treats a unit of money in year 5 as worth the same as today and ignores everything after year 5, so it is a screening tool; NPV or LCOE are used for the decision. 0.2 is the inverse ratio (60,000/300,000).
What is the solar altitude at solar noon on the June solstice (δ = +23.45°) at a site of latitude 28.6° N?
A. 84.85°
At noon θz = |φ − δ| = |28.6 − 23.45| = 5.15°, so altitude α = 90 − 5.15 = 84.85°. Taking θz = φ + δ gives 37.95°, a low sun wrong for midsummer; 5.15° is the zenith angle, not the altitude; 61.4° ignores declination (equinox value).
A site at 77.2° E uses a standard meridian of 82.5° E. At 12:00 standard time the equation of time is +3 min. What is the local solar time?
B. 11:41.8
Solar time = standard time − 4(Lst − Lloc) + E for a site west of its standard meridian in the eastern hemisphere: 12:00 − 4 × (82.5 − 77.2) min + 3 min = 12:00 − 21.2 + 3 = 11:41.8. Adding the longitude correction gives 12:24.2 (or 12:18.2 if E is also subtracted), and subtracting E gives 11:35.8. The site lies west of the standard meridian, so the sun reaches it later than the clock suggests.
Which instrument measures beam (direct normal) solar radiation?
A. Pyrheliometer
A pyrheliometer is a collimating tube pointed at the sun on a tracker, so it sees only the sun's disc and a narrow ring around it. A pyranometer sees the whole hemisphere (global radiation); the Campbell–Stokes recorder gives sunshine hours; an anemometer measures wind speed.
An off-grid farmhouse uses 3 kWh per day. The design month has 5 peak sun hours, and the overall array derating factor is 0.7. What array size is needed?
B. 857 Wp
Array = daily energy/(PSH × derating) = 3000/(5 × 0.7) = 857 Wp. 600 Wp ignores losses; multiplying by the derating gives 420 Wp; 2100 Wp is 3000 × 0.7, a confusion of energy with power.
Anti-islanding protection in a grid-connected PV inverter:
B. Disconnects the inverter when the grid fails, so the system does not energise lines being repaired
An 'island' is a section of network kept live by local generators after the grid has gone down; it endangers line workers. Grid-tied inverters must shut down on loss of grid, which is why an ordinary on-grid system without battery backup gives no power in an outage.
In most farm solar pumping systems, energy for cloudy periods is stored mainly as:
C. Water in an elevated tank or reservoir
Storing water is far cheaper and longer-lived than storing electricity, so most solar pumps are battery-less and directly coupled through a controller, with a tank or the soil profile buffering supply.
A water-pumping windmill 'furls' in high winds. What does furling do?
D. Turns the rotor partly out of the wind (usually through the tail vane) to limit speed and loads
Above the design speed a windmill's rotor could overspeed and overload the pump rod. Furling swings the rotor edgewise to the wind, reducing its effective area. It does not change the pump's action.
Ten here, 48 in the app. The Laisha app has every practice question we have written to Agricultural and Biosystems Engineers Licensure Examination in this subject, marked as you go, with timed papers, a jump-to-unanswered list and a certificate when you pass at 70 per cent.
Free for ten days, then one subscription of US$10 a month. We would rather say so here than have you find it later.
An AI operating system for agriculture: free guides, manuals and tools written for every country.