What this subject covers

Removing excess water and salt: surface and subsurface drain design, and reclaiming saline and sodic land.

In the exams: GATE AG Section 5 (drainage coefficient in 5 of 8, SAR and leaching in 3 of 8 papers 2019–26); ICAR AIEEA-PG Unit VII; ICAR AICE subjects 40 and 43; NCEES PE drainage; RPSC AAE

What ICAR AICE-JRF/SRF asks from it

ICAR AICE-JRF/SRF (PhD) — subjects 40 SWCE and 43 IDE

PG-depth theory: assumptions of Hooghoudt, Ernst, Kirkham and Glover-Dumm, equivalent depth, drainable porosity, envelope design criteria, USBR dynamic equilibrium, bio-drainage and vertical drainage, reclamation chemistry and the gypsum requirement.

Where the 59 questions fall

How our questions for ICAR AICE-JRF/SRF spread across the units of Agricultural Drainage Engineering. Difficulty: 1 easy, 36 medium, 22 hard.

Kirkham and Glover-Dumm equations9
Subsurface drain spacing: Hooghoudt and Ernst7
Drain pipes and envelopes7
Vertical drainage and bio-drainage7
Reclamation of saline and sodic soils and gypsum requirement6
Drainage coefficient5
Interceptor and relief drains5
Salinity and the leaching requirement5
Irrigation water quality: EC, SAR and RSC4
Causes and effects of waterlogging2
Surface drainage design2

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

1 · Causes and effects of waterlogging · hard

In a piezometer nest, the piezometer open at 2 m depth has its water level 0.8 m below the ground surface and the one open at 6 m depth has its water level 0.3 m below the surface. What is the direction and magnitude of the vertical hydraulic gradient between them?

  1. Upward, gradient 0.125
  2. Downward, gradient 0.125
  3. Upward, gradient 0.5
  4. Downward, gradient 0.083
Answer and working

A. Upward, gradient 0.125

Taking the ground surface as datum, head at 2 m = -0.8 m and at 6 m = -0.3 m. The deeper point has the higher head, so water moves upward. Gradient = 0.5 m / (6 - 2) m = 0.125. Reporting 0.5 forgets to divide by the 4 m distance; 'downward' reads the levels as depths instead of heads. Upward seepage means relief wells or drains designed for extra inflow.

Further reading: Ritzema (ed.), Drainage Principles and Applications, ILRI Publication 16

2 · Drainage coefficient · medium

Over six consecutive days the water-table depths were 5, 15, 25, 35, 20 and 40 cm. What is SEW30 for this period?

  1. 40 cm-days
  2. 65 cm-days
  3. 55 cm-days
  4. 4 cm-days
Answer and working

C. 55 cm-days

SEW30 sums (30 - depth) only for days when the water table is shallower than 30 cm: 25 + 15 + 5 + 10 = 55 cm-days; the 35 and 40 cm days add nothing. 40 wrongly subtracts the deep days; 65 adds depths instead of excesses; 4 counts days.

Further reading: Sieben's SEW30; Skaggs and van Schilfgaarde, Agricultural Drainage

3 · Drainage coefficient · hard

In Hiler's stress day index (SDI) for drainage design, what are the two factors multiplied for each growth stage?

  1. A stress-day factor such as SEW30 and a crop susceptibility factor for that stage
  2. The drainage coefficient and the drain spacing chosen for that growth stage
  3. Drainable porosity and saturated hydraulic conductivity of the soil at each stage
  4. Rainfall return period and runoff coefficient
Answer and working

A. A stress-day factor such as SEW30 and a crop susceptibility factor for that stage

SDI = sum of (SD x CS): the stress-day factor measures how wet the soil was, and the crop susceptibility factor measures how sensitive the crop is at that stage. The other pairs are design inputs, not stress indices.

Further reading: Skaggs and van Schilfgaarde, Agricultural Drainage

4 · Subsurface drain spacing: Hooghoudt and Ernst · hard

Ernst: q = 6 mm/day, L = 40 m, Kv = 0.5 m/day over Dv = 0.3 m above drains, transmissivity Sum(KD) = 4.0 m2/day, radial layer Kr = 0.8 m/day and Dr = 5 m, wetted perimeter u = 0.3 m, a = 1. What total midpoint head h results?

  1. 0.30 m
  2. 0.42 m
  3. 0.27 m
  4. 0.57 m
Answer and working

D. 0.57 m

hv = qDv/Kv = 0.006 x 0.3 / 0.5 = 0.0036 m. hh = qL^2 / (8 Sum KD) = 0.006 x 1600 / 32 = 0.300 m. hr = (qL / pi Kr) ln(Dr/u) = (0.24 / 2.513) x ln(16.67) = 0.269 m. Total = 0.57 m. 0.30 m keeps only the horizontal term; 0.42 m uses log10 in the radial term; 0.27 m is the radial term alone.

Further reading: Ritzema (ed.), Drainage Principles and Applications, ILRI Publication 16

5 · Kirkham and Glover-Dumm equations · hard

Glover-Dumm: K = 1.0 m/day, average flow depth D = 4.5 m, drainable porosity 0.05, initial midpoint head 1.0 m above drains, required head 0.7 m after 3 days (initial shape a fourth-degree parabola). What drain spacing is needed?

  1. 23 m
  2. 67 m
  3. 73 m
  4. 7.3 m
Answer and working

C. 73 m

L^2 = pi^2 K D t / [mu ln(1.16 h0/ht)] = 9.870 x 1.0 x 4.5 x 3 / [0.05 x ln(1.657)] = 133.2 / (0.05 x 0.5051) = 5276 m2; L = 73 m. 23 m omits pi^2; 67 m uses 1.27 (flat initial water table); 7.3 m enters porosity as 5 instead of 0.05.

Further reading: Ritzema (ed.), Drainage Principles and Applications, ILRI Publication 16

6 · Kirkham and Glover-Dumm equations · hard

In the Glover-Dumm spacing equation, with all else unchanged, the drainable porosity of a soil is found to be twice the design value. The required spacing becomes:

  1. Twice the original spacing
  2. Half the original spacing
  3. The original spacing divided by about 1.41
  4. The original spacing multiplied by about 1.41
Answer and working

C. The original spacing divided by about 1.41

L^2 is inversely proportional to mu, so L scales with 1/sqrt(mu): doubling mu divides L by sqrt 2 = 1.41. More water must drain per metre of fall, so drains must be closer, not wider.

Further reading: Ritzema (ed.), Drainage Principles and Applications, ILRI Publication 16

7 · Drain pipes and envelopes · medium

Mole drainage is best suited to which situation?

  1. A stable clay subsoil in which an unlined channel keeps its shape
  2. A loose sandy subsoil
  3. A stony soil with boulders
  4. A deep peat that stays soft and is subject to subsidence after drainage
Answer and working

A. A stable clay subsoil in which an unlined channel keeps its shape

A mole plough forms an unlined channel that survives only in cohesive, stable clay. It collapses in sand, cannot be drawn through stones, and deforms in peat.

Further reading: Smedema, Vlotman and Rycroft, Modern Land Drainage

8 · Vertical drainage and bio-drainage · medium

Vertical drainage by tubewells is most attractive where:

  1. A thin clay layer lies over an impermeable rock
  2. Groundwater is highly saline and there is no outlet or evaporation pond for disposing of it
  3. The soil is a heavy clay with a perched water table that tubewells can drain quickly
  4. A transmissive aquifer lies beneath and the pumped water is fresh enough to reuse
Answer and working

D. A transmissive aquifer lies beneath and the pumped water is fresh enough to reuse

The pumped water then becomes an irrigation supply, giving conjunctive use. Thin clay over rock and perched tables have no aquifer to pump; saline water without an outlet creates a disposal problem.

Further reading: Ritzema (ed.), Drainage Principles and Applications, ILRI Publication 16

9 · Vertical drainage and bio-drainage · medium

Controlled drainage (drainage water management) with an adjustable outlet structure is used mainly to:

  1. Increase the drainage coefficient during storms by lowering the outlet well below the normal drain depth
  2. Pump saline water into evaporation ponds
  3. Prevent ochre formation
  4. Raise the drain water level when drainage is not needed, conserving water and cutting nitrate losses
Answer and working

D. Raise the drain water level when drainage is not needed, conserving water and cutting nitrate losses

Raising the outlet holds water in the profile outside critical periods and cuts nitrate export; it is lowered before field operations.

Further reading: Skaggs and van Schilfgaarde, Agricultural Drainage

10 · Reclamation of saline and sodic soils and gypsum requirement · medium

Using the leaching relation (C/C0)(Dw/Ds) = 0.3 for continuous ponding, how much water must infiltrate to reduce salinity in the top 0.6 m to 20 % of its initial value?

  1. 0.3 m
  2. 0.036 m
  3. 0.9 m
  4. 3.0 m
Answer and working

C. 0.9 m

Dw = k x Ds / (C/C0) = 0.3 x 0.6 / 0.2 = 0.9 m. 0.3 m uses k = 0.1, which applies to intermittent ponding; 0.036 m multiplies by C/C0; 3.0 m omits k. Constants are soil-specific; confirm in a trial.

Further reading: Hoffman, in FAO Irrigation and Drainage Paper 29

Ten here, 59 in the app. The Laisha app has every practice question we have written to ICAR AICE-JRF/SRF in this subject, marked as you go, with timed papers, a jump-to-unanswered list and a certificate when you pass at 70 per cent.

Free for ten days, then one subscription of US$10 a month. We would rather say so here than have you find it later.

Practise the full set in Laisha →

Read the subject

Agricultural Drainage EngineeringThe full study manual, free ICAR AICE-JRF/SRFFormat, sections and how it has changed

More ICAR AICE-JRF/SRF practice

Remote Sensing, GIS & GNSS for Land & WaterWater Resources Management, Floods & Canal SystemsFood Quality, Safety & Process Plant DesignBio-energy Systems: Design & ApplicationsSoil Science for EngineersAgricultural Drones, Robotics & AutomationHeat & Mass TransferPrecision Agriculture & System ManagementProtected Cultivation & Greenhouse EngineeringInstrumentation, Sensors & Process ControlStorage Engineering, Material Handling & PackagingRenewable Energy Sources (Solar, Wind)Fluid Mechanics & Open Channel HydraulicsSoil MechanicsHuman Engineering, Ergonomics & SafetyFood & Dairy EngineeringEngineering Properties of Agricultural ProduceWatershed Planning & ManagementTractor Systems & ControlsPost-Harvest Engineering of Horticultural CropsMechanics of Tillage & Traction (Soil Dynamics)Farm Machinery Testing, Evaluation & StandardsMachine DesignHydraulic Drives & Controls

Agricultural Drainage Engineering for other exams

ICAR AIEEA-PG · IndiaGATE · IndiaASRB NET · India

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.