Nepal Engineering Council Registration Exam Watershed Planning & Management: practice questions

Nepal Engineering Council Registration Exam — Agricultural Engineering · Nepal · Nepal Engineering Council

Original practice questions written to the published syllabus · not past papers
10worked here, free
17written to this exam in this subject
9syllabus units

About Nepal Engineering Council Registration Exam

Nepal Engineering Council Registration Exam — Agricultural Engineering is a licensing and registration exam run by Nepal Engineering Council, for candidates in Nepal.

Official site: nec.gov.np.

We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.

Watershed Planning & Management in Nepal Engineering Council Registration Exam

Planning a whole watershed: delineating it, classifying its land, budgeting its water and choosing harvesting structures with the people who live there.

Our 17 Nepal Engineering Council Registration Exam questions in this subject: 0 easy, 13 medium, 4 hard, across 9 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to Nepal Engineering Council Registration Exam and are not shown on any other exam's page.

Question 1 · medium

For which situation is the topographic (surface) watershed most likely to be a poor boundary for a groundwater budget?

  1. A steep granite catchment with thin soils
  2. A small catchment on uniform clay with a shallow impermeable layer
  3. A forested hill catchment with well-defined ridges
  4. Karst limestone with sinkholes
Answer and working

D. Karst limestone with sinkholes

In karst (limestone) terrain, water sinking into solution channels can flow under the surface divide into a neighbouring basin, so the groundwater catchment differs from the surface watershed. On granite or clay with a shallow impermeable layer, most water moves near the surface and the topographic divide is a reasonable boundary.

Question 2 · medium

The general water balance equation for a watershed over a period is best written as:

  1. Inflow − outflow = change in storage
  2. Rainfall = runoff
  3. Inflow + outflow = change in storage
  4. Evapotranspiration = rainfall × runoff coefficient
Answer and working

A. Inflow − outflow = change in storage

Conservation of mass: what enters minus what leaves equals the change in storage (soil moisture, groundwater, surface stores). Rainfall equals runoff only if all other terms are zero, which never happens in practice.

Question 3 · medium

Zai (planting pits) and contour stone lines, widely used to rehabilitate degraded cropland in Burkina Faso and Niger, are examples of:

  1. external (macro) catchment flood-water spreading
  2. micro-catchment water harvesting within the field
  3. storage of runoff in a reservoir for irrigation
  4. sub-surface drainage of waterlogged fields
Answer and working

B. micro-catchment water harvesting within the field

Zai pits concentrate runoff and manure at each planting station, and stone lines slow runoff across the field so it infiltrates; both collect water from a small area next to the plants. Flood-water spreading brings water from a large external catchment; reservoirs store it for later use.

Question 4 · medium

A household of 5 people needs 20 litres per person per day of roof water for drinking and cooking through a dry season of 120 days. Assuming the tank is full at the start of the dry season, the storage required by the demand-side method is:

  1. 1.2 m³
  2. 12 m³
  3. 120 m³
  4. 0.6 m³
Answer and working

B. 12 m³

Storage = daily demand × dry days = 5 × 20 × 120 = 12,000 litres = 12 m³. The other answers are decimal slips or omit the per-person demand. The method also requires that the roof actually yields at least this much by the end of the wet season.

Question 5 · hard

In a watershed project, valley farmers support a grazing closure on the upper common land, but landless herders oppose it and continue grazing at night. Which planning response is most likely to make the closure work?

  1. Negotiate with the herders so they get cut-and-carry fodder, a share of benefits such as water, and a say in the rules
  2. Ask the police to enforce the closure and fine the herders
  3. Abandon treatment of the common land and work only on private fields, where ownership is clear and nobody objects
  4. Fence the area with barbed wire and let the valley farmers guard it at night in turns until the grass is established
Answer and working

A. Negotiate with the herders so they get cut-and-carry fodder, a share of benefits such as water, and a say in the rules

The herders bear the cost of the closure while valley farmers gain; unless they gain too, they have every reason to break it. Sharing fodder, water or produce and involving them in rule-making aligns incentives. Policing and fencing without agreement usually fail, and dropping common land leaves the main runoff and sediment source untreated.

Question 6 · medium

Which PRA tool is most suited to showing the months of food shortage, peak labour demand and out-migration in a village?

  1. Social map
  2. Transect walk
  3. Venn diagram
  4. Seasonal calendar
Answer and working

D. Seasonal calendar

A seasonal calendar plots rainfall, work, food availability, migration, disease and prices month by month, which helps time works so they provide employment when people need it. Social maps show households; transects show spatial zones; Venn diagrams show institutions.

Question 7 · medium

The World Bank-supported watershed rehabilitation project on China's Loess Plateau, begun in the mid-1990s, is best known for combining:

  1. large dams for hydropower with resettlement of all farmers (off the plateau)
  2. conversion of all cropland to rice paddies
  3. terracing of sloping farmland, check (silt-trapping) dams and revegetation with a ban on free grazing
  4. sprinkler irrigation of the entire plateau from the Yellow River, with pumping stations on every major tributary
Answer and working

C. terracing of sloping farmland, check (silt-trapping) dams and revegetation with a ban on free grazing

The project combined terraces, sediment-trapping check dams that form new flat fields, afforestation and grassland restoration with restrictions on free grazing, and was widely cited for raising incomes while reducing sediment reaching the Yellow River.

Question 8 · medium

In the United States, small watershed projects planned with local sponsors for flood prevention and conservation are funded under:

  1. the Watershed Protection and Flood Prevention Act of 1954 (Public Law 83-566)
  2. the Tennessee Valley Authority Act of 1933 (TVA Act) only
  3. the Clean Air Act
  4. the Homestead Act
Answer and working

A. the Watershed Protection and Flood Prevention Act of 1954 (Public Law 83-566)

PL 83-566 authorises federal help, through the Soil Conservation Service (now the Natural Resources Conservation Service), for watershed projects sponsored by local organisations. The TVA of 1933 is a basin authority for one river system; the Clean Air and Homestead Acts are unrelated.

Question 9 · medium

'Fanya juu' terraces, promoted widely under Kenya's national soil and water conservation programme, are formed by:

  1. throwing the soil downhill from a contour trench to form a bund below it, which is then planted with fodder grass
  2. building stone walls across gullies
  3. digging a trench along the contour and throwing the soil uphill to form a bund, which becomes a bench over time
  4. planting single rows of trees along the field boundary
Answer and working

C. digging a trench along the contour and throwing the soil uphill to form a bund, which becomes a bench over time

Fanya juu means 'throw it upwards' in Kiswahili: soil from a contour trench is thrown uphill to form an embankment, and soil moving downslope builds up behind it, gradually forming a level bench. Throwing soil downhill makes a fanya chini.

Question 10 · medium

Nepal's government department responsible for soil conservation and watershed management, established in 1974, works mainly through:

  1. community user groups, building on the approach of community forestry
  2. private contractors without community involvement
  3. large river-basin authorities modelled on the TVA
  4. the armed forces
Answer and working

A. community user groups, building on the approach of community forestry

Nepal's Department of Soil Conservation and Watershed Management has worked with community user groups in hill watersheds, in line with the country's community forestry experience. It is not organised as a river-basin authority.

A study plan for Watershed Planning & Management in Nepal Engineering Council Registration Exam

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (53% of the 17 questions): National watershed programmes (5, 29%); Land capability classification (2, 12%); Participatory watershed planning (2, 12%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Rainwater harvesting: check dams, percolation tanks and farm ponds (2, 12%); Roof-top rainwater harvesting (2, 12%); Cost-benefit analysis of watershed projects (1, 6%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Land irrigability classification (1, 6%); Water budgeting (1, 6%); Watershed delineation (1, 6%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Participatory watershed planning (1 hard of 2), Rainwater harvesting: check dams, percolation tanks and farm ponds (1 hard of 2), Roof-top rainwater harvesting (1 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — Nepal Engineering Council Registration Exam Watershed Planning & Management

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.