ASRB NET Soil & Water Conservation Engineering: practice questions

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering · India · Agricultural Scientists Recruitment Board (ICAR)

Original practice questions written to the published syllabus · not past papers
10worked here, free
22written to this exam in this subject
12syllabus units

About ASRB NET

ASRB NET — Farm Machinery & Power / Land & Water Management Engineering / Agricultural Structures & Process Engineering is a specialist certification exam run by Agricultural Scientists Recruitment Board (ICAR), for candidates in India. NET: 150 MCQs, 150 marks, 2 hours, −1/3 per wrong answer, English/Hindi, PG level. Combined NET/ARS/SMS/STO recruitment runs prelims, mains and interview.

Official site: pw.live.

We have not been able to confirm these details against the exam body's own specification, so fees, dates and pass marks are left out on purpose. Check the current format, eligibility, fees and dates on the official site.

Soil & Water Conservation Engineering in ASRB NET

Similar to the ICAR PhD paper: concepts, standard design relations and their assumptions, with some numerical items on bunds, terraces, waterways and seepage.

Estimating erosion and designing the bunds, terraces, waterways, spillways, ponds and dams that control it.

Our 22 ASRB NET questions in this subject: 1 easy, 14 medium, 7 hard, across 12 units.

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

These 10 were written to ASRB NET and are not shown on any other exam's page.

Question 1 · medium

On a hillslope segment where soil detached by rain and flow exceeds what the runoff can carry, erosion is:

  1. detachment-limited, and deposition occurs
  2. detachment-limited, and the flow is under-loaded
  3. transport-limited, and the flow scours the bed
  4. transport-limited, and deposition occurs
Answer and working

D. transport-limited, and deposition occurs

When detachment supplies more sediment than the flow's transport capacity, the excess settles: the process is transport-limited. Detachment-limited conditions have spare transport capacity, so the flow can pick up more soil and there is no deposition.

Question 2 · medium

As the drainage area of a watershed increases, its sediment delivery ratio generally:

  1. decreases, because there are more opportunities for deposition
  2. first decreases then rises sharply
  3. increases, because more channels carry sediment to the outlet quickly
  4. stays constant for a given soil
Answer and working

A. decreases, because there are more opportunities for deposition

Larger watersheds have gentler average slopes, floodplains and more storage sites, so a smaller share of the eroded soil reaches the outlet. The relation is roughly a small negative power of area, with coefficients that vary by region.

Question 3 · hard

Contour bunds are spaced at a vertical interval of 1.2 m. The design runoff is 12 cm. The depth of water impounded against each bund is closest to:

  1. 0.054 m
  2. 0.54 m
  3. 0.288 m
  4. 3.79 m
Answer and working

B. 0.54 m

h = √(Re × VI / 50) with Re in cm and VI in m: √(12 × 1.2/50) = √0.288 = 0.54 m. This comes from Re·HI = h²/(2s) and HI = VI/s. Using Re in metres inside the /50 form gives 0.054 m, and omitting the /50 gives √(12 × 1.2) = 3.79 m.

Question 4 · medium

The formula h = √(Re·VI/50) for depth of water behind a contour bund assumes that the stored water forms:

  1. a parabola matching the phreatic line in the bund
  2. a rectangle of depth h extending the full horizontal interval between bunds
  3. a triangle upslope of the bund whose length is h divided by the land slope
  4. a trapezoid including the bund's upstream side slope
Answer and working

C. a triangle upslope of the bund whose length is h divided by the land slope

Runoff from one metre of bund, Re × HI, is stored as a triangle of depth h at the bund and length h/s upslope: area h²/(2s). With HI = VI/s this gives h = √(2 Re VI), or √(Re VI /50) with Re in cm. The bund's own side slope is neglected.

Question 5 · medium

The conservation bench terrace developed by Zingg and Hauser for semi-arid land works by:

  1. collecting runoff from the benches in a graded channel and carrying it quickly down to a grassed waterway outlet
  2. storing water in an underground cistern for livestock
  3. draining runoff from a sloping contributing area onto a level bench below, where it is stored and cropped
  4. planting tree rows on steep risers to supply fuel
Answer and working

C. draining runoff from a sloping contributing area onto a level bench below, where it is stored and cropped

Part of the land is left sloping as a runoff-producing area, and the level bench below receives that water, increasing the water available to the crop on the bench. It is a water-harvesting terrace for dry climates.

Question 6 · medium

Manning's n for a grass-lined channel decreases as the product of velocity and hydraulic radius (VR) increases because:

  1. the grass roots bind the bed more tightly at high flows, smoothing the surface
  2. sediment deposits smooth the channel at high flows
  3. the Froude number falls as VR increases
  4. deeper, faster flow bends the grass flat, reducing the flow resistance
Answer and working

D. deeper, faster flow bends the grass flat, reducing the flow resistance

Vegetal retardance curves show n falling with VR: at low VR the grass stands up and resists flow; at high VR it lies flat and acts like a smoother surface. The effect is strongest for tall retardance classes.

Question 7 · hard

In a gully with a 6% bed slope, sediment trapped behind the dams settles at a stable slope of 2%. Allowing for this deposit slope, the spacing of 0.9 m effective-height check dams becomes:

  1. 22.5 m
  2. 15.0 m
  3. 11.25 m
  4. 45.0 m
Answer and working

A. 22.5 m

L = H/(S_g − S_c) = 0.9/(0.06 − 0.02) = 22.5 m. The deposit behind each dam rises at 2% towards the next dam, so fewer dams are needed than the head-to-toe spacing of 15 m. Adding the slopes gives 11.25 m and using only the deposit slope gives 45.0 m.

Question 8 · medium

As the head on a drop-inlet (pipe) spillway rises from zero, the controlling flow regime changes in the order:

  1. orifice control, weir control, pipe control
  2. weir control, pipe control, orifice control
  3. pipe control, orifice control, weir control
  4. weir control, orifice control, full-flow pipe control
Answer and working

D. weir control, orifice control, full-flow pipe control

At low heads the riser crest acts as a weir; as it submerges the inlet acts as an orifice; at higher heads the conduit runs full and the whole pipe governs. At each head the smallest of the three capacities applies.

Question 9 · medium

Soil at the downstream toe of a small dam has specific gravity 2.65 and void ratio 0.70. The exit gradient is 0.25. The factor of safety against piping (heave) is closest to:

  1. 0.26
  2. 9.43
  3. 0.97
  4. 3.88
Answer and working

D. 3.88

i_c = (G − 1)/(1 + e) = 1.65/1.70 = 0.971. FS = i_c / i_exit = 0.971/0.25 = 3.88. Quoting i_c alone gives 0.97, dividing by e instead of 1 + e gives 9.43, and inverting the ratio gives 0.26.

Question 10 · hard

If soil transport by wind is taken as proportional to the cube of friction velocity, a 20% increase in friction velocity (above threshold) increases the transport rate by about:

  1. 20%
  2. 73%
  3. 44%
  4. 60%
Answer and working

B. 73%

Ratio = 1.2³ = 1.728, an increase of about 73%. The square law gives 44%; tripling the percentage (60%) is not the same as cubing the ratio. 20% assumes a linear law.

A study plan for Soil & Water Conservation Engineering in ASRB NET

This plan follows where our questions actually fall, so the time goes where the marks are likely to be. It is our reading of the syllabus, not the exam body's weighting.

  1. First, the heavy units (50% of the 22 questions): Earthen dams: seepage and stability (4, 18%); Soil loss estimation: USLE, RUSLE and MUSLE (3, 14%); Contour and graded bunds (2, 9%); Mechanics of water erosion (2, 9%).

    Read the manual chapters for these first and do every worked question you can find on them.

  2. Then the middle band: Sediment yield (2, 9%); Wind erosion control and shelterbelts (2, 9%); Wind erosion mechanics (2, 9%); Agronomic and biological conservation measures (1, 5%).

    Aim for one sitting per unit, then mixed questions across them.

  3. Then the lighter units: Bench and broad-base terraces (1, 5%); Drop, drop-inlet and chute spillways (1, 5%); Grassed waterways (1, 5%); Gully control (1, 5%).

    Learn the definitions, classifications and standard numbers; these units are more often recalled than worked.

  4. Leave time for the hard ones: Gully control (1 hard of 1), Contour and graded bunds (1 hard of 2), Sediment yield (1 hard of 2).

    Come back to these after a first pass, untimed, and read every explanation, including for the options you rejected.

  5. Bank the easy marks: Soil loss estimation: USLE, RUSLE and MUSLE (1 easy of 3).

    Do these early in revision so they are fast on the day.

  6. Finish timed. Sit the subject as a timed set without notes, mark it, and send each wrong answer back to its unit above.

Last updated · How Laisha writes and checks its pages · Report a mistake

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.

Unlock every question — ASRB NET Soil & Water Conservation Engineering

US$10 a month · one price worldwide · cancel any time

  • Every practice question in this subject, with full working
  • Timed exam papers and progress by unit
  • Ask Laisha to explain any answer — up to 1,000 questions a month
Free or Smarter
FreeSmarter
Grow guides, pest pages, articlesRead allRead all
Ask Laisha5 a dayUp to 1,000 a month
Exam practiceThe sample on each pageEvery question, timed papers
Crop calendar and pest alerts—For your own fields
Calculators and tools—All
Uploads and reports—100 a month, real files
10 days free for every new account, no card.