ICAR AICE-JRF/SRF Dairy Plant Design, Layout & Project Engineering: practice questions

ICAR AICE-JRF/SRF (PhD): Dairy Chemistry, Dairy Microbiology, Dairy Technology, Dairy Engineering · India · NTA for ICAR

Original practice questions written to the published syllabus · not past papers
10worked here, free
32written to this exam in this subject
11syllabus units

What this subject covers

Planning a dairy plant from product mix to building: location, layout, equipment sizing, pressure vessels, costing and commissioning.

In the exams: ICAR AIEEA-PG group 17 Unit II (dairy plant layout and design, functional design, space requirement); ICAR AICE subject 38 Unit 5

What ICAR AICE-JRF/SRF asks from it

ICAR AICE-JRF/SRF (PhD) — Dairy Engineering (38), Unit 5

Process equipment and pressure vessel design: thin-shell stresses, design thickness of shells and heads, head types, supports, codes and corrosion allowance, together with equipment sizing. Expect derivation-style and numerical questions at a higher level, and comparisons of head shapes and design choices.

Where the 32 questions fall

How our questions for ICAR AICE-JRF/SRF spread across the units of Dairy Plant Design, Layout & Project Engineering. Difficulty: 3 easy, 10 medium, 19 hard.

Pressure vessel design: codes, shells, heads and supports11
Installation, commissioning and validation4
Process flow diagrams and mass balances3
Equipment sizing and selection3
Product mix and capacity planning2
Functional design and space requirements2
Hygienic zoning and personnel flow2
Building, floors, drains and services2
Plant location and site selection1
Layout of reception, processing, packing and storage areas1
Project costing, feasibility and detailed project reports1

10 practice questions, worked

Choose an answer, then open the working. Each explanation says why the right answer is right and why the others are not.

1 · Process flow diagrams and mass balances · hard

Why do utility peaks in a dairy plant often coincide with cleaning periods?

  1. Cleaning stops all production, so every utility reaches zero
  2. Cleaning uses only cold water, which lowers steam demand
  3. Refrigeration must be switched off whenever any line is cleaned
  4. Hot detergent and rinse water are drawn while other lines keep producing
Answer and working

D. Hot detergent and rinse water are drawn while other lines keep producing

CIP draws heated water and detergent and large rinse volumes, while other lines continue processing, so steam and water demand peak together. Production does not stop everywhere during cleaning, and hot cleaning raises steam demand.

2 · Functional design and space requirements · medium

Why must clear height be considered as carefully as floor area in a dairy processing hall?

  1. Higher ceilings always reduce the plant's refrigeration load
  2. Tall equipment, bowl removal and overhead pipe racks need vertical space
  3. Building codes everywhere fix the same height for all food plants
  4. Clear height matters only for offices and laboratories
Answer and working

B. Tall equipment, bowl removal and overhead pipe racks need vertical space

Silos, separators that need head room to lift the bowl, and pipe racks set the height, and powder plants need very tall buildings for driers. Higher ceilings usually increase the air volume to condition, and height rules vary by country.

3 · Hygienic zoning and personnel flow · hard

A plant has condensation dripping from cold pipes above an open filler. Which design response addresses the cause?

  1. Raise the filler's speed so less product is exposed to each drip
  2. Increase the frequency of finished-product testing at the filler
  3. Fit a wider drip tray under the filler to catch spilled product
  4. Improve ventilation and insulate or reroute the cold pipes away from open product
Answer and working

D. Improve ventilation and insulate or reroute the cold pipes away from open product

Condensation forms when warm humid air meets cold surfaces; ventilation, insulation and routing cold pipes away from open product remove the source. Faster filling, more testing and drip trays do not stop drips falling onto product.

4 · Hygienic zoning and personnel flow · hard

Why is hygienic zoning decided at the layout stage rather than after the building is designed?

  1. Zoning only affects the colour of staff uniforms, which can change any time
  2. Auditors refuse to inspect zoning that was planned after construction
  3. It sets walls, air handling, drains and changing rooms, hard to alter later
  4. It is decided by the equipment supplier, who must know it before ordering
Answer and working

C. It sets walls, air handling, drains and changing rooms, hard to alter later

Zones determine physical features of the building: partition walls, air handling with pressure cascades, drain routes and changing facilities. Retrofitting them in a finished building is expensive. Uniform colours follow zoning, they do not define it.

5 · Pressure vessel design: codes, shells, heads and supports · easy

Compared with a cylinder of the same diameter and wall thickness, what is the membrane stress in a sphere under the same internal pressure?

  1. Twice the cylinder's hoop stress
  2. Equal to the cylinder's hoop stress
  3. One quarter of the cylinder's hoop stress
  4. Half the cylinder's hoop stress
Answer and working

D. Half the cylinder's hoop stress

A sphere's stress is PD/(4t) in all directions, half the cylinder's hoop stress PD/(2t). That is why hemispherical heads need about half the thickness of the shell.

6 · Pressure vessel design: codes, shells, heads and supports · medium

Why are flat heads rarely used on vessels with significant internal pressure?

  1. They cannot be welded to a cylindrical shell at all
  2. They are banned by every pressure vessel code in force
  3. They bend under pressure and need very great thickness
  4. They make the vessel impossible to drain completely
Answer and working

C. They bend under pressure and need very great thickness

A flat plate resists pressure by bending, so it needs much more thickness than a curved head, which resists pressure mainly by membrane tension. Flat heads are used for low pressures or small diameters and can be welded and permitted under codes.

7 · Pressure vessel design: codes, shells, heads and supports · hard

What must a hygienic dairy pressure vessel's supports satisfy in addition to the pressure code?

  1. Be painted the same colour as the vessel for easy identification
  2. Allow floor cleaning beneath and avoid crevices that trap soil
  3. Be made of mild steel so that they rust visibly when damaged
  4. Be welded directly into the floor drain for maximum stability
Answer and working

B. Allow floor cleaning beneath and avoid crevices that trap soil

Legs and supports must leave space to clean the floor and must not create crevices or ledges, so hygienic design rules apply alongside the structural ones. Rusting supports and supports set into drains are unhygienic.

8 · Equipment sizing and selection · hard

A pump moves 30 cubic metres per hour of a liquid of density 1,000 kg/m³ against a total head of 25 m with 65 percent efficiency. What shaft power is needed?

  1. About 2.0 kW
  2. About 4.8 kW
  3. About 3.1 kW
  4. About 1.3 kW
Answer and working

C. About 3.1 kW

Hydraulic power = ρgQH = 1,000 × 9.81 × (30/3,600) × 25 = 2.04 kW; shaft power = 2.04 ÷ 0.65 = 3.1 kW. 2.0 kW ignores efficiency; 4.8 kW divides twice; 1.3 kW multiplies by efficiency instead of dividing.

9 · Building, floors, drains and services · medium

Why are services routed through service corridors or external pipe bridges where possible?

  1. Pipes in corridors need no insulation in any climate
  2. It halves the length of every pipe in the plant
  3. Regulations forbid any pipe inside a production room
  4. Maintenance staff can work on them without entering high-hygiene rooms
Answer and working

D. Maintenance staff can work on them without entering high-hygiene rooms

Keeping valves, unions and services outside high-hygiene rooms reduces traffic and contamination risk during maintenance. Pipe lengths and insulation needs are not reduced by this, and some pipes must enter production rooms.

10 · Installation, commissioning and validation · medium

Why are internal welds on dairy product pipelines inspected, for example with a borescope?

  1. Inspection makes the pipe stronger under pressure
  2. Borescopes measure the flow rate through the line
  3. Internal welds determine the colour of the product
  4. A poor internal weld leaves an uncleanable crevice
Answer and working

D. A poor internal weld leaves an uncleanable crevice

Lack of penetration or rough internal welds leave crevices where soil and bacteria lodge and CIP cannot reach. Inspection finds them before the line enters service.

Ten here, 32 in the app. The Laisha app has every practice question we have written to ICAR AICE-JRF/SRF in this subject, marked as you go, with timed papers, a jump-to-unanswered list and a certificate when you pass at 70 per cent.

Free for ten days, then one subscription of US$10 a month. We would rather say so here than have you find it later.

Practise the full set in Laisha →

Read the subject

Dairy Plant Design, Layout & Project EngineeringThe full study manual, free ICAR AICE-JRF/SRFFormat, sections and how it has changed

More ICAR AICE-JRF/SRF practice

Rheology & Texture of Dairy FoodsFermentation Technology & Dairy BiotechnologyInstrumentation, Process Control & AutomationAdvanced Dairy MicrobiologyAdvanced Dairy Technology & Product DevelopmentAdvanced Dairy EngineeringResearch Methods, Experimental Design & Scientific CommunicationAdvanced Dairy ChemistryStarter Cultures & Lactic Acid BacteriaDairy Pathogens, Toxins & Microbial RiskQuality Assurance, Statistical Quality Control & Laboratory ManagementDairy Analysis & Instrumental MethodsMicrobiology of Raw & Market MilkChemistry of Dairy ProductsMilk Proteins & EnzymesMicrobiology of Dairy ProductsMembrane Processing & Dairy IngredientsLactose, Milk Salts & VitaminsProbiotics, Prebiotics & Functional Dairy FoodsMicrobiological Quality Assurance & Rapid MethodsDairy Effluent Treatment & Environmental ManagementMilk LipidsEmerging & Non-thermal Dairy ProcessingDairy Plant Utilities & Energy Management

Dairy Plant Design, Layout & Project Engineering for other exams

ICAR AIEEA-PG · IndiaNDDB and dairy cooperative recruitment · India

Ask Laisha about this

Opens Laisha's chat with your question ready to send. Sign in or start free.